English German Spanish French Italian Polish Russian
Engineering Division

Established in 1957, with over 50 years experience of excellence in metalwork fabrication, our engineering division has vast, high quality engineering experience.

We currently have contracts for fabricated metalwork with global destinations north and south America, Europe and the Middle East.

Our company offers a high standard of workmanship with all completed work finished to the highest standards required today.

 

Recent Projects

Recent major construction projects to which our engineering division supplied fabricated metalwork for include:

 
  Hide Thumbs First Previous Pause Next Last
Slideshow speed: 5 seconds
 
Move
Bt Tower
  • Bt Tower
    Bt Tower
  • Greenpark Reading
    Greenpark Reading
  • Odyssey
    Odyssey Arena - Belfast
  • RBS Doncaster
    RBS Doncaster
  • Royal Victoria Hospital
    Royal Victoria Hospital
  • Waterfront Hall - Belfast
    Waterfront Hall - Belfast
  • Altnagelvin Hospital
    Altnagelvin Hospital
  • Dundrum Centre - Dublin
    Dundrum Centre - Dublin
  • Victoria Square - Belfast
    Victoria Square - Belfast
  • Victoria Square - Belfast
    Victoria Square - Belfast
  • West Ham Lane - London
    West Ham Lane - London
  • West Ham Lane - London
    West Ham Lane - London

Bt Tower
 
 

 



 


Key services available include:
  • Specialists in aluminium & stainless steel fabrication
  • 4 metre cutting and folding
  • CNC 6 metre high capacity rollers for tanks/tubes
  • CNC Plasma cutting
  • CNC Press brake folding
  • CNC milling
  • Structural engineering
  • Storage tanks
  • High rise chimneys and flu’s
  • Gantrys/ballustrading
  • Aluminium cladding
  • Food engineering
  • Mezzanine flooring

 

 

 


Home : About Us : Reelers : Dribble Bars : Pumps & Hoses : Flow Meters : Contracts Division : Engineering Division : Contact
© SlurryKat 2009